Earthwork support and attendance to an archaeological excavation to remove burials to allow the construction of a new day facility with basement and upper floors to St Pauls Church.

Formwork and reinforcement in preparation for waterproof concrete for the construction of a sub-terrain swimming pool and leisure facility to a private house. This structure will be completely hidden by the reinstatement of the garden with one metre of topsoil and patio area.

Construction of an underground swimming pool to the rear of a Victorian terraced property. The ground floor slab was constructed first and then the walls and basement slab were formed, saving 25 ton of temporary work in a restricted conservation area.

Underpinning, excavation and retaining walls to form a sunken garden in a restricted Knightsbridge dwelling.

Trench sheeting and frame to allow the excavation of a shaft for deep drainage.

Enabling works and access to allow the commencement of a new basement.

Where possible Patterson Construction will excavate using mechanical means other than by traditional means

Mini piling to form retaining wall in a restricted site in The Boltons, London

Temporary support to existing house to enable the construction of a basement larger than the footprint of the house and 80% of a large garden.

Single sided formwork to an 8 meter high wall to form new basement.

Traditional underpin to existing garden wall to form new basement structure

Forming concrete sheet for new swimming pool using top down construction

Drilling and casing piles for forming a King post drop wall

Lifting a 5 ton excavator over terraced houses for use in constructing a new basement

Concrete walls and slab including temporary works for the formation of a new play and utility room under the rear garden of a Chelsea property

Contiguous and tension piles to form new basement swimming pool and gym

Voltex waterproofing to underground structure

Removing spoil using conveyor to place the spoil into a waiting lorry

Cutting down piles for testing and forming new pile caps for a hotel extension

Dewatering system to lower the water table by 2.00 metres for the formation of a new basement.

Inspection of steel for the construction of a basement ground slab.

Exposed concrete to a museum basement.

Numerous retaining walls to support sloping garden.

Installation of Preprufe water proof system

Water bar fixed to trench piling for Caltite concrete